Virginia: Mountain Valley Pipeline Fighters Disrupt Construction

Photo via Appalachians Against Pipelines.

Yesterday, two pipeline fighters locked themselves to construction equipment at a Mountain Valley Pipeline work site in Franklin County, VA, preventing work at the site. The banners read, “EARTH IS ON FIRE, TURN OFF THE GAS” and “¡SOLIDARIDAD CON PUERTO RICO!”

When asked why he’s taking action, Cricket, one of the people locked to equipment today, said, “Lots of things bring us here, I think. Speaking for myself, I’m currently going to school for integrated science education, which means my long term life plan is to become a science teacher. Hopefully my blossoming legal record after this doesn’t mess that up for me, but those goals stem from wanting to empower and support the wellbeing of future generations. Those commitments that call me to education are the same commitments that being me here, trying to protect the earth from another pipeline that will contribute to the mass extinction we’re going through right now.

“Unless we can stop climate chaos, the students I teach won’t have a planet to learn about, or potable water to drink, or even clean air to breathe, for that matter. So no matter what happens after this, I know I’m doing something that I will be proud to explain for the rest of my life. Clove and I are expressing care for the future.”

Clove, the other person locked on site, stated the following in reference to the “¡SOLIDARIDAD CON PUERTO RICO!” banner: “One indicator of climate destabilization is the increasing severity of hurricanes. In 2017, Hurricane Maria devastated the island of Puerto Rico as well as other surrounding places. After the hurricane, most of the disaster relief came from the people first impacted. This shouldn’t really come as a surprise to anyone — the first responders are always those first impacted — and it also shouldn’t come as a surprise that the government turned their noses up at the people struggling to keep themselves and their communities alive in the wake of that disaster.

“Since that hurricane, we’ve seen communities take care of each other in ways the government won’t, and now more than ever we’re seeing people take that power and use it to reject that government all together. We want to show love and support to the folks in Puerto Rico that are fighting for autonomy in their lives after a disaster, on a planet that’s only going to have more disasters in the near future.”

Clove and Cricket prevented Mountain Valley Pipeline work at the Franklin County site for 6.5 hours! They were then extracted from their blockade and arrested. One friend was charged with 2 misdemeanors and released on $1,500 bail. The other was arraigned but is being held without bail.

Meanwhile, today is day 345 at the Yellow Finch tree sit blockade near Elliston, VA!

Donate to support Cricket, Clove, Yellow Finch, and ongoing resistance to the MVP: bit.ly/supportmvpresistance

 

Pipeline fighter scales welding machine at Mountain Valley Pipeline worksite

cross-posted from Appalachians Against Pipelines

Montgomery County, VA — Yesterday morning, Pipeline fighter River scaled a critical piece of welding machinery at a Mountain Valley Pipeline work site in Montgomery County, VA, preventing work at the site from proceeding further along the pipe.

River stated: “It is a common misconception that we all contribute to and suffer from environmental damage equally. It is large corporations like EQT that are destroying our homes while their CEOs look on from their penthouses. This is why ‘reduce, reuse, recycle’ is not enough. We will never be able to recycle enough empty milk jugs to make up for the hundreds of miles of forests and farmlands that the MVP has devastated in its wake.

The banner hanging on site reads “LOVE THE LAND: SOLIDARITY WITH MAUNA KEA,” in reference to the ongoing blockade by Native Hawaiians of a sacred site in Hawai’i that is threatened by the construction of a massive telescope. The blockade, which is in 18th day of preventing construction, is not just about a telescope — it is about the ongoing desecration and exploitation of Native culture and rights.

In support of River’s action, a banner was hung above nearby Interstate 81 at exit 128, reading: “DEFEND WHAT YOU LOVE, STOP MVP, RESISTANCE = SURVIVAL.”

After seven and a half hours, River was extracted and arrested. They prevented welding from progressing along the pipe at a Mountain Valley Pipeline work site for that time. They were arraigned, and held without bail on misdemeanor charges.

Donate to support River and ongoing resistance.

 

More Blockades at Mountain Valley Pipeline Worksites

pic: Appalachians Against Pipelines

Cross-posted from Appalachians Against Pipelines

More action against the Mountain Valley Pipeline this week.

On Monday, 10 water protectors blocked the entrance to a Mountain Valley Pipeline work site in Montgomery County, VA! They prevented MVP from accessing the site for over 2 hours.

And then today [Thursday], a pipeline fighter locked down and blocked construction across the road from the Yellow Finch blockade! After days of MVP drawing nearer, work can now be seen from the tree sitters perch in the branches of the Oak and White Pine. In response Violet has locked herself onto the easement in order to stop MVP from progressing forward.

Violet stated,

“Without a doubt, the Mountain Valley Pipeline needs to be stopped. It will destroy a precious environment that provides vivid life to the countless plants, animals, and communities that call this region home. The most shameful things have been done to this land and to the people who have lived here. It is destruction in the name of exploitation and profit. We’ve already lost so much life on our planet, and what is left cannot sustain this any longer.

I’ve continued to find hope among the communities of resistance in this region. Mirroring the dynamic natural relationships that make these forests and mountains so beautiful, courageous people of Appalachia and beyond have shown resilience that is capable of combatting the pipeline’s threat. By struggling together, we have created ways of loving and of fighting everything that projects such as the MVP stand for.

This is no time for neutrality. Our tree sits are still up, and the Mountain Valley Pipeline has fallen behind schedule. It will continue to do so.”

Support Violet and other pipeline resistors! If you can’t make it out in person, please donate: bit.ly/supportmvpresistance

Today is DAY 317 at the Yellow Finch tree sits. Please join us, now it the time. Message us if you need directions, or for information about how to get involved.

Third Week of Pipeline Fighting in Appalachia Shuts Down MVP Construction Again!

photo via Appalachians Against Pipelines.

This morning, a pipeline fighter named Andy climbed an excavator at a Mountain Valley Pipeline work site in Summers County, WV, and locked themself to it, preventing work at the site.

The pipeline fighter was locked to the excavator for multiple hours this morning, but came down on their own due to thunderstorm-related safety concerns. They were not arrested.

They stated, “I stand against the Mountain Valley Pipeline and all forms of exploitation and destruction of this planet. As we speak, MVP is destroying pristine forests, and beautiful and biodiverse bodies of water.

“We are in a place of serious urgency, not a place for any expansion of natural gas infrastructure. The time is now to take direct action against who and what is consciously valuing profits over people and our planet. Electoral tactics have failed us again, with MVP continuing work with revoked permits and ignoring local officials.

“No amount of fines can stop a systemic devaluation of our futures at the hand of a capital giant.

“I protest here today for my brother and sister, who likely won’t see a future as beautiful as I have. Standing in opposition to this antihuman hyper capitalist hegemony is my obligation, and I hope you see that it is yours as well.”

Support Andy and resistance to the Mountain Valley Pipeline: bit.ly/supportmvpresistance