Tag: Enbrdige
Park Rapids, MN: 8 Water Protectors Blockade Line 3 Fueling Station
8 Water Protectors Blockade Line 3 Fueling Station
Water Protectors Lock Down Inside Line 3 Pipeline
cross-posted from the Giniw Collective
(Backus, MN) Thursday morning, water protectors locked to each other inside a Line 3 pipe segment, halting construction at an Enbridge worksite as dozens more held space.
The site is a few miles from a large Enbridge man camp operating in the township of Backus, Minnesota. Enbridge is working 24 hours per day at several worksites, as a pending injunction to halt work while tribally-led lawsuits are heard has yet to be decided.
According to several cultural site maps, numerous sacred and significant sites lie in the path of the Line 3 project.
Water Protector Abby Hornberger said, “After moving to Minnesota to attend college and study environmental science, I was excited to be in a place where people valued protecting the earth and finding a viable future. What I found, however, was a state that had formed “ambitious” climate goals yet endorsed one of the dirtiest fossil fuels, tar sands oil. I realized that indigenous ways of knowing and practicing harmony with the environment are continuously ignored. The Line 3 pipeline far outweighs all clean energy initiatives and progress being made in renewable energies. Line 3 will destroy Minnesota’s essential clean water resources for future generations and will ultimately drive us into climate doom. Education and spreading awareness is no longer enough to create meaningful change for me.”
Hornberger continued, “Enbridge’s last ditch effort to build fossil fuel infrastructure is killing people and the planet. I refuse to be complicit in settler colonialist practices, and feel that I have to put my body on the line to protect indigenous communities’ sovereignty and all of our futures. This is not just an issue relevant to some, it affects each of us on a deeper level that goes beyond our daily lives. It determines if we will have a livable future.” Continue reading
Water Protectors Lock to Enbridge Office Gates, Work Halted
FOR IMMEDIATE RELEASE:
August 19, 2019
Contact: ginew@protonmail.com
ayse@ran.org
Water Protectors Lock to Enbridge Office Gates, Work Halted
Bemidji, MN — In the early morning, 6 water protectors locked to the gates of a key Enbridge office in Bemidji, MN in protest of proposed tar sands pipeline project Line 3. 2 chained their necks to the gate, risking personal safety for the hundreds of watersheds Enbridge proposes to send nearly 1M barrels of tar sands from Alberta through on its way to the shores of Lake Superior.
Enbridge responded by closing its office for the day.
Wild rice season is nearing, in which Anishinaabe people will take to their canoes to harvest the sacred food that is at the heart of Anishinaabe culture. Enbridge plans to send tar sands through dozens of wild rice watersheds, irrevocably impacting its growth and survival.
Line 3 is one proposed infrastructure project out of the Alberta tar sands, alongside TransCanada’s Keystone XL and Kinder Morgan’s TransMountain pipelines. Tar sands is the dirtiest fossil fuel in the world. Weeks ago, the Teck Frontier Mine, a proposed tar sands expansion twice the size of Vancouver was recommended by a board of Canadian environmental regulators.
“As an able-bodied and willing person, it is my duty to stand with Anishinaabe people who are putting their lives on the line every day standing up for all of us, for all of our water.” Kieran Cuddy said, while locked to the front gate of Enbridge’s office.
###