Water Protector Climbs Into Line 3 Pipeline Trench To Stop Work

cross-posted from Camp Miigizi

FOR IMMEDIATE RELEASE:
January 18, 2021
Contact: message Camp Migizi on Facebook

Water Protector Climbs Into Line 3 Pipeline Trench To Stop Work

(Fond Du Lac, MN) Monday morning, Nia Zekan, a water protector, climbed into a pipe trench along the Line 3 Pipeline easement, shutting down work for approximately four hours. Nia halted construction at this Enbridge worksite while dozens more stood around in support of Nia and resistance to Line 3.

The site is located on the Fond Du Lac reservation in so-called northern Minnesota, right next to Camp Migizi, a recently-opened space for water protectors. Continue reading

Water Protectors Lock Down Inside Line 3 Pipeline

pics via Giniw Collective

cross-posted from the Giniw Collective

(Backus, MN) Thursday morning, water protectors locked to each other inside a Line 3 pipe segment, halting construction at an Enbridge worksite as dozens more held space.

The site is a few miles from a large Enbridge man camp operating in the township of Backus, Minnesota. Enbridge is working 24 hours per day at several worksites, as a pending injunction to halt work while tribally-led lawsuits are heard has yet to be decided.

According to several cultural site maps, numerous sacred and significant sites lie in the path of the Line 3 project.

Water Protector Abby Hornberger said, “After moving to Minnesota to attend college and study environmental science, I was excited to be in a place where people valued protecting the earth and finding a viable future. What I found, however, was a state that had formed “ambitious” climate goals yet endorsed one of the dirtiest fossil fuels, tar sands oil. I realized that indigenous ways of knowing and practicing harmony with the environment are continuously ignored. The Line 3 pipeline far outweighs all clean energy initiatives and progress being made in renewable energies. Line 3 will destroy Minnesota’s essential clean water resources for future generations and will ultimately drive us into climate doom. Education and spreading awareness is no longer enough to create meaningful change for me.”
Hornberger continued, “Enbridge’s last ditch effort to build fossil fuel infrastructure is killing people and the planet. I refuse to be complicit in settler colonialist practices, and feel that I have to put my body on the line to protect indigenous communities’ sovereignty and all of our futures. This is not just an issue relevant to some, it affects each of us on a deeper level that goes beyond our daily lives. It determines if we will have a livable future.” Continue reading

Backus, MN: Water Protectors Blockade Line 3 Pipe-yard

pic via Giniw Collective

cross-posted from the Giniw Collective

FOR IMMEDIATE RELEASE:
December 28, 2020
Contact: giniw@protonmail.com

Water Protector Ascends Tripod Blockading Enbridge Line 3 Pipe-yard

(Backus, MN) Monday morning, a water protector bravely ascended a tripod high in the air blockading an Enbridge pipe-yard, as dozens of supporters held space below.

Since giving the final green light on November 30th for Enbridge to bulldoze through Minnesota’s watersheds for its tar sands expansion project, the Walz administration has met a series of escalating direct actions with complete silence. Actions have ranged from mass arrest, prayer walks to proposed river drilling sites, tree sits, and locking to heavy equipment.

On December 19th, a Line 3 construction worker was killed at an Enbridge worksite. After an hours-long halt, work resumed.

Before ascending into the air in front of a tar sands pipe-yard, Emma Harrison said, “I’m part of the Line 3 resistance movement because this pipeline embodies everything I believe is wrong with the world. Profits for a few are being privileged over the well-being of all communities near and far, present and future. Stopping Line 3 is a tangible way to fight for the world I want to live in.”

Live updates and photos can be found on Giniw Collective’s Facebook page.

Line 3 Protest at logging site in Cass County, MN

pic via Northfield Against Line 3

cross-posted from Northfield Against Line 3

WATER PROTECTORS PROTEST TAR SANDS LINE 3 PIPELINE

A peaceful rally held in Northern Minnesota promoted Indigenous sovereignty and climate justice

CASS COUNTY, MN —  20 water protectors held a rally today at a logging site where workers had been patch clear cutting trees along the proposed route of Line 3, the proposed tar sands pipeline expansion owned by Canadian company Enbridge Energy. At 1PM, water protectors from across Minnesota, including organizers with Northfield Against Line 3, rallied for over an hour among large logging equipment and felled trees, chanting “Honor the Treaties!” and “Stop Line 3” before they left the site.

“We are here to send the message loud and clear: Line 3 will not be built! All pipelines spill, and Enbridge has deliberately misled the public. We need real climate solutions, and they must be rooted in honoring Indigenous sovereignty,” said Elizabeth (a pseudonym), one of the water protectors involved in the rally.

This afternoon’s acts of civilian oversight build off of a decade of growing opposition to the proposed Line 3 pipeline, which would transport 760,000 barrels of tar sands oil per day from Alberta, Canada to the western shore of Lake Superior. Despite facing significant delays in court, the company has allowed to begin what it calls “pre-construction,” making today’s intervention a necessary step in enforcing transparency along the proposed corridor. Line 3’s proposed route puts sensitive ecosystems at risk, including 15 watersheds and 215 lakes, and its associated carbon emissions would further destabilize the global climate. Enbridge is still waiting for the verdict on their 401 water quality permit, a crucial oversight from the Minnesota Pollution Control Agency.

pic via Northfield Against Line 3

Today’s action highlights acts of patch clear cutting in a ecologically vulnerable area that directly abuts the proposed Line 3 expansion route. This logging of birch and pine trees is part of a legacy of abuse upon the land and the land’s original inhabitants by logging companies and the state government who bought the land cheaply, making way for decades of violent extraction. While the profits from rotating timber permits are supposed to support township services, the logging occurred in 1855 Treaty Territory, violating the rights of the Anishinaabe people to fish, hunt and gather, and make free, prior and informed decisions regarding any project.

“We must end the perpetuation of settler colonialism and cycle of mindless extraction. We’re here fighting for a livable future for all, because another world is not only necessary, but possible,” said Emerson (a pseudonym), another water protector involved in the action.

Buoyed by the actions of several groups opposing Line 3 in so-called Minnesota and beyond, today’s successful rally will no doubt continue to galvanize the wider movement to stop all fossil fuel projects, especially tar sands extraction, and demand climate justice. Activists came to observe and protest nearby logging to raise awareness of the devastating possibilities of business as usual.