Water Protectors Block Gate at Enbridge U.S. Tar Sands Terminal in Minnesota

Pics from Northfield Against Line 3

cross-posted from Northfield Against Line 3

FOR IMMEDIATE RELEASE:
November 25th, 2019
Contact: giniw@protonmail.com
ayse@ran.org

Water Protectors Block Gate at Enbridge U.S. Tar Sands Terminal: We Will Stop Line 3

Early Monday morning, water protectors blockaded the primary gate of Enbridge’s U.S. terminal, the entry point of several pipelines carrying Alberta tar sands into the region.

One water protector was suspended from a tripod, in solidarity with indigenous-led opposition to Enbridge’s proposed Line 3 pipeline. Line 3 poses to be a 10% increase of tar sands extraction. The project seeks to pass through the Mississippi River headwater, hundreds of watersheds, and terminate at Lake Superior.

Pics from Northfield Against Line 3

The climber, Sara-Beth Anderson, 21, a resident of Minneapolis, said, “I am a diver and love the ocean with all of my heart. The destruction of the sacred is happening because of these terrible decisions to keep extracting, to keep harming the earth despite what climate science has told the world’s leaders. I take this risk for the unborn, for the indigenous peoples fighting to protect their territories all over the planet, for the oceans. Anyone can take a stand against the greatest threat facing our shared world — get involved, get involved now.”

Water Protectors Lock Down to Stop Line 3 Construction

via Ginew Collective 

Water Protectors Lock Down to Stop Line 3 Construction, Powerlines Built for Tar Sands Pipeline Through Army Corps Land as Enbridge Seeks Water Crossing Permits

FOR IMMEDIATE RELEASE
June 3, 2019
Contact: ginew@protonmail.com

(Park Rapids, MN) This morning, water protectors supported by Ginew Collective, Northfield Against Line 3 and others halted work at an active construction site on the proposed Line 3 route. Three water protectors locked themselves to logging equipment while over a dozen concerned citizens rallied in support.

Great River Energy, Enbridge’s named utility provider for numerous pump stations it needs to power its tar sands pipeline, is logging through water crossings and wetlands next to the Line 3 route.

Enbridge has significant unmet energy needs to power the Line 3 route, and notes its partnership with Great River Energy in its application to the Army Corps of Engineers to bulldoze through wetlands and water crossings. Great River Energy specifies in its Army Corps application that it is building the electric transmission line to power Enbridge’s pipeline unbuilt pump station.

Minnesota has not issued the Minnesota Pollution Control Agency (MPCA) or DNR permits required for Line 3 construction across wetlands or water crossings. Minnesota announced the 401 water quality certification process will not be complete until fall 2019.

“Enbridge pretends to follow the process while it is busy bulldozing through our forests and wetlands,” said Frances Weatherall while locked to logging equipment.

“This is a years-long plan to send more dirty tar sands through Minnesota, don’t be fooled into thinking they won’t destroy as much as they can while they wait for their final state permits,” said Mollie Weatherall, locked with her sister on the same machine.

Jonas, who was also locked to a machine said, “This is a step towards decolonization, Enbridge is carving up the planet and our government doesn’t care. Today it’s my turn to put my body between the planet I want to protect and the attacks against our water, our climate, and Native sovereignty.”

###

PLEASE SHARE:

Link to fundraise for bail: PayPal.me/nfldal3

Link to Facebook post with press release & pictures: https://m.facebook.com/story.php?story_fbid=2254586604870599&id=2061510617511533

Water Protector Blockades Enbridge Great Lakes Office, Crowds Rally Across Minnesota on Day of Enbridge Shareholders Meeting

FOR IMMEDIATE RELEASE
Contact: ginew@protonmail.com
laurel@ran.org

Water Protector Locks Down to Tripod Blocking Enbridge Great Lakes Office, Crowds Rally Across Minnesota on Day of Enbridge Shareholders Meeting

(Superior, MN) This morning, water protectors erected a tripod in front of the Enbridge Great Lakes office in Superior, at the terminus of the proposed Line 3 tar sands pipeline. One water protector locked down to the top of the tripod, with a message for the Enbridge shareholders: Line 3 will never be built in Minnesota.

Across northern Minnesota, water protectors gathered in Duluth and Bemidji, in solidarity against Enbridge’s promises to its shareholders that Line 3 will be fully operational by the second half of 2020. Enbridge lacks state permitting

Resistance against new tar sands pipeline expansion projects has been fierce. Delays or cancellations of the Energy East pipeline, Keystone XL pipeline, TransMountain pipeline, and Line 3 pipeline resulted in an announcement by the Alberta Premiere that tar sands production would be reduced by 8.7% for 2019.

When asked why they would take such a personal risk to their own safety, Anthony Graham (Chumash) said, “I stand in solidarity with my relatives up north and across Turtle Island. This is for the future. We have to be brave and fight. The oil industry is trying to grow when we know climate change is killing us. No more tar sands.”

###

Water Protectors Disrupt Minnesota Governor’s Public Interview to Demand He #StopLine3 Pipeline

Protestors disrupt public talk by MN Gov. Tim Walz. #stopLine3

Posted via Northfield Against Line 3

February 13, 2019

Water Protectors Disrupt Governor Walz Public Interview to Demand He Stop Line 3 Pipeline

A dozen leaders with Northfield Against Line 3 held banners and publicly questioned Gov Walz at a University of Minnesota event.

ST PAUL, MN – Today a dozen Water Protectors peacefully disrupted a public interview with Minnesota Governor Tim Walz at the Humphrey School of Public Affairs to demand he halt pre-construction of the Line 3 tar sands pipeline during the appeals process. 

Yesterday Governor Walz announced he would re-file the Department of Commerce’s appeal to the Certificate of Need for the pipeline project. However, Enbridge is currently engaged in illegal pre-construction, clear cutting trees and building access roads, for the toxic project.

Stop Line 3. Photo via Northfield Against Line 3.

A dozen members of “Northfield Against Line 3” persistently interrupted the MPR interview with questions of their own. The Governor was publicly questioned about his 2017 comments denouncing Enbridge’s new pipeline and about the contradictions in his tacit support for a carbon-producing pipeline and his support for Green New Deal legislation. Water Protectors unfurled banners demanding he #StopLine3 and not exacerbate the crisis of missing and murdered Indigenous women as a result of the pipeline’s construction. Governor Walz responded that he’s met with groups opposing the pipeline but the fact is that he has yet to meet with Indigenous youth after promising to do so. 

All five of the directly affected Objibwe Tribal Nations in Minnesota oppose Line 3 because of the threat it poses to their fresh water, culturally significant wild rice lakes, and tribal sovereignty. Line 3 will accelerate climate change by bringing carbon-intensive tar sands bitumen from Alberta to refineries in the Midwest. Climate change disproportionately impacts Indigenous and frontline communities across the world. 

For photos and videos see Facebook: https://www.facebook.com/nfld.against.line.three

Twitter: twitter.com/ResistLine3 

###